– Computer Aided Drawing Office Practice (CAD)

  • Home
  • – Computer Aided Drawing Office Practice (CAD)

– Computer Aided Drawing Office Practice (CAD)

Wishlist Share
Share Course
Page Link
Share On Social Media

About Course

Computer Aided Drawing Office Practice (CAD)

LP_018_E: Module 4: Methods used to identify, prevent, or reduce inflow, infiltration, and exfiltration is described in terms of their techniques. Master the practical engineering and maintenance techniques used to manage unwanted water movement into, out of, and within water and wastewater pipe networks.

Why Enroll?

  • Specify Sealing Techniques: Detail the correct pipe jointing and sealing methods in your drawings to prevent leakage (exfiltration).
    • Design for Water Tightness: Understand the materials and installation standards required to prevent groundwater infiltration (I/I).
      • Support System Maintenance: Detail the manhole inspection, smoke testing, and CCTV survey requirements for existing systems.
        • Reduce System Costs: Minimize the volume of clear water that unnecessarily enters the treatment plant, saving energy and chemical costs.
Show More

Student Ratings & Reviews

No Review Yet
No Review Yet
Select your currency
USD United States (US) dollar